My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Gemini at Colfax Exterior Renovations, Div. E - Windows Proj No. 119-103 - Vic Butcher Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order No 1 - Gemini at Colfax Exterior Renovations, Div. E - Windows Proj No. 119-103 - Vic Butcher Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 11:25:15 AM
Creation date
11/12/2020 11:25:13 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />DATE INITIATED:BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Attachments: (List documents support change required) <br />Amount of Increase / Decrease: $____________________Categories (Pick One): <br />Scope of Work <br />Differing Site Conditions, Changed Conditions <br />Conflicted Specifications and Drawings <br />Failed Materials <br />Error <br />Omission <br />Final Quantity Adjustment <br />_______________________ <br />Previously approved Change Order(s): $___________________ <br />Current Percent of Change: ____________________ % <br />New Total Amount: $____________________ <br />Total Percent of Change: ____________________ % <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDED BY: <br />Project Inspector (Print Name)(Signature)(Date) <br />REVIEWED BY: <br />Construction Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />City Engineer (Print Name)(Signature)(Date)
The URL can be used to link to this page
Your browser does not support the video tag.