My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - One (1) or More, 2020 or Newer, Emergency Medical Vehicle – Spec P - American Response Vehicles
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - One (1) or More, 2020 or Newer, Emergency Medical Vehicle – Spec P - American Response Vehicles
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 1:40:53 PM
Creation date
11/12/2020 11:10:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Test Lab <br />AL ACC Climate Control, Inc. <br />AM D STAN DARD 008 (REV F) <br />Patient Compartment Grab Rail Static Load Test <br />AM D008 <br />41 of 43 <br />Tested For: AEV Temperature: 60 °F <br />Date: 12/12/2013 Humidity: 12% <br />Chassis: N/A <br />Type: I, or III <br />VIN: Raw Module - N/A <br />Test Set -Up <br />4.1 $4 Using a straight edge (6' level) measure the grab rail for straightness. <br />47W Measure the space between the top sides of the rail and the ceiling. <br />4.3 W Draw a sketch of the grab rails showing dimensions. <br />4.4 Construct the framework necessary to apply proper load to the grab rail. <br />Procedures & Test Results <br />5.1 $4 Attach the force application device and tension load cell to the grab rail at a midpoint between <br />two brackets. <br />5.2 04 Apply a Vertical load of 3001b. in 501b increments. Observe the grab rail for any detachment, <br />loosening or permanent deformation. <br />5.3 $4 Hold the 3001b. Load for 2 minutes and release. <br />5.4 W In the same method apply a 3001b load vertically, horizontally, and diagonally at 3 locations <br />along the rail. <br />5.5 OC Record the angle used for the diagonal load application. Any convenient angle <br />may be used. 26.6 Degrees <br />Location #1 <br />Location #2 <br />Location #3 <br />Location Description <br />Max Load <br />Horizontal <br />310 <br />312 <br />309 <br />Max Load Vertical <br />331 <br />321 <br />317 <br />Max Load at 26.6" <br />Angle <br />315 <br />1 306 <br />1 307 <br />5.6 PW Using a straight edge (6' level) measure the grab rail for straightness. <br />57W Measure the space between the top sides of the rail and the ceiling. <br />5.8 W Draw a sketch of the grab rails showing dimensions. <br />77W The grab rail must not detach, loosen, or permanently deform during the load application of <br />300 lbs. in any direction. <br />7.1 $4 Take pictures of test procedure for documentation. <br />Automotive Climate Control • 22428 Elkhart East Blvd. • P.O. Box 1905 • Elkhart, IN 46515-1905 <br />P(574) 264-2190 • F(574) 266-6744 • sales@accclimatecontrol.com • www.accelimatecontrol.com <br />2013-017 AEV Raw Module AMD001-025 Test Forms <br />U:\AMDKKK-A-1822 <br />
The URL can be used to link to this page
Your browser does not support the video tag.