My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - One (1) or More, 2020 or Newer, 60’ Aerial Two Wheel Drive Tower Truck – Spec J - Altec Industries, Inc. #1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - One (1) or More, 2020 or Newer, 60’ Aerial Two Wheel Drive Tower Truck – Spec J - Altec Industries, Inc. #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 11:08:37 AM
Creation date
11/12/2020 11:07:43 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
incorporating counterbalance load holding valves to lock the platform in <br />the event of hydraulic line failure. <br />M. <br />Outrigger/boom interlock system prevents boom from being unstowed until <br />_X_ <br />outriggers have been at least partially deployed. <br />N . <br />Outrigger/Unit selector control is located near the outrigger controls, <br />X <br />allows operator to divert hydraulic oil from machine circuit for outrigger <br />operation. This reduces the potential for inadvertent outrigger movement <br />during machine operation if outrigger controls are bumped. <br />O. <br />Outrigger motion alarm provides audible alarm when any of the outriggers <br />_X <br />are in motion. <br />P. <br />Diagnostic Pressure Test Quick Disconnect Couplings: are located at the <br />_X_ <br />turntable to allow a mobile service technician to quickly and easily attach a <br />test gauge to verify system and tool circuit pressure. This convenient <br />troubleshooting feature saves time and reduces the risk of high pressure oil <br />sprays- <br />Q. <br />Unit meets or exceeds ANSI 92.2 standards. <br />X <br />2. <br />Automatic stow system EA <br />1 X <br />3. <br />Single two -man 24x48x42 90 degree rotator and jib/winch. Platform EA <br />1 _X_ <br />capacity rated at 700 pounds. <br />A. <br />Material handling jib capacity is in addition to platform capacity. Jib and <br />_X_ <br />winch system includes hydraulic tool lines in boom to furnish 8.0 gpm at <br />2'000 psi (30.3 1pm/13 800 kPa) and includes: <br />B. <br />Material handling' hydraulically articulated jib' -30 degree to +90 degree <br />tilt angle (relative to the upper boom). Jib also extends from 43 to 67 <br />_X_ <br />inches ( 1092 x 1702 mm) in five pinning positions. <br />C. <br />One (1) piece 4.0 inch (101.6 mm) square jib <br />X_ <br />D. <br />Hydraulically powered winch rated to 2'000 pounds (907.2 kg) full drum' <br />_X_ <br />mounted on the side of the upper boom <br />E. <br />80 feet of 7/16 inch (24.4 m of 11.1 mm) double -braided synthetic rope <br />X_ <br />F. <br />Control valves at platform for hydraulic tools' platform rotation' jib tilt' jib <br />extend and winch control <br />_X_ <br />G. <br />Auxiliary winch line control valve and platform rotation valve at the <br />turntable to allow rescue <br />_X_ <br />H. <br />Valve at boom tip relieves pressure from quick disconnect couplings in Off <br />position. Open -center or closed -center tools may be operated from tool <br />_X_ <br />circuit <br />I. <br />Fiberglass covers <br />X <br />4. <br />Soft Platform Cover For Two Man Platform (24x48) EA <br />1 X <br />5. <br />Polyethylene platform liner for two man platform' 50 kV rating (minimum) EA <br />1 X <br />6. Engine start/stop with Secondary Stowage System' 12 VDC electric powered. EA 1 _X <br />Includes auxiliary pump and electric motor' powered by the chassis battery. <br />Control is captive air operated from the platform and toggle switch operated <br />from the lower controls. This option allows the operator to completely stow <br />the booms and platform in a situation wherein the engine' PTO or pump fails. <br />
The URL can be used to link to this page
Your browser does not support the video tag.