Laserfiche WebLink
CCS of South Bend Discarity Study 2020 <br />tract and subcontract payments for the study period .117 However, for this study, <br />we went further, and applied a "90/90/90" rule, whereby we analyzed NAICS <br />codes for City -funded contracts that cover over 90 percent of the total contract <br />dollars; over 90 percent of the prime contract dollars; and over 90 percent of the <br />subcontract dollars. We took this approach to assure a comprehensive analysis of <br />the City of South Bend's contracting activities. <br />The City of South Bend's Unconstrained Product Markets <br />Tables 4-1 through 4-3 present the NAICS codes used to define the product <br />market for the City's contracts. These contracts were disaggregated by level of <br />contract (i.e., was the firm receiving the contract as a prime vendor or a sub- <br />contractor), the label for each NAICS code, and the industry percentage distri- <br />bution of the number of contracts and spending across NAICS codes. The <br />following tables present South Bend's unconstrained product market, which <br />was later constrained by the geographic market area, discussed below. <br />Table 44: Industry Percentage Distribution of the City of South Bend's <br />Contracts <br />by Dollars Paid, All Contracts <br />117. National Academies of Sciences, Engineering, and Medicine 2010, Guidelines for Conducting a Disparity and Availability <br />Studyfor the Federal DBE Program. Washington, DC: The National Academies Press. https://doi.org/10.17226/14346. <br />("Notional Disparity Study Guidelines"). <br />50 01010 Colette Holt & Associates, All Rights Reserved. <br />Total <br />Cumulative <br />NAICS <br />NAICS Code DescriptionPct <br />.. <br />Dollars <br />237310 <br />Highway, Street, and Bridge Construction <br />16.30% <br />16.30% <br />Electrical Contractors and Other Wiring Installation <br />238210 <br />9.84% <br />26.14% <br />Contractors <br />541330 <br />Engineering Services <br />6.61% <br />32.75% <br />Water and Sewer Line and Related Structures <br />237110 <br />6.44% <br />39.19% <br />Construction <br />238910 <br />Site Preparation Contractors <br />5.24% <br />44.43% <br />238220 <br />Plumbing, Heating, and Air -Conditioning Contractors <br />4.23% <br />48.66% <br />441110 <br />New Car Dealers <br />3.72% <br />52.39% <br />333120 <br />Construction Machinery Manufacturing <br />3.33% <br />55.72% <br />238310 <br />Drywall and Insulation Contractors <br />3.02% <br />58.74% <br />117. National Academies of Sciences, Engineering, and Medicine 2010, Guidelines for Conducting a Disparity and Availability <br />Studyfor the Federal DBE Program. Washington, DC: The National Academies Press. https://doi.org/10.17226/14346. <br />("Notional Disparity Study Guidelines"). <br />50 01010 Colette Holt & Associates, All Rights Reserved. <br />