My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Water Hydraulic Model Updates & Flow Testing – Black & Veatch Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Water Hydraulic Model Updates & Flow Testing – Black & Veatch Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:33:26 AM
Creation date
10/27/2020 3:36:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
node in the model. Engineer will compare model results to the observed field data collected during <br />the hydrant flow tests and adjust model parameters as needed to achieve an acceptable calibation. <br />A draft technical memorandum summarizing the steady state model calibration process and results <br />will be prepared and submitted to the Owner in PDF format for review. A teleconference will be <br />held with the Owner to review the draft technical memorandum with the project manager and <br />senior modeling engineer. The Owner's comments will be incorporated into the final technical <br />memorandum. <br />Deliverables under this task include a draft and final technical memorandum and final <br />WaterGEMS model files. <br />Task 104 — Project Management and Administration <br />Provide project supervision, direction, and coordination with the Owner's management and staff. <br />Project administration and management also includes budget and schedule control, document <br />control, coordination of activities, monthly invoicing and project close-out. Engineer will <br />maintain a change register of any scope changes affecting the project budget or schedule and <br />review it with the Owner on a monthly basis for up to five months. Engineer shall discuss and <br />receive written approval for any scope changes from the Owner prior to proceeding. <br />Fa I <br />Pq <br />• <br />word <br />• <br />MI I ON <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. Ali rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.