Laserfiche WebLink
Page 2 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />node in the model. Engineer will compare model results to the observed field data collected during <br />the hydrant flow tests and adjust model parameters as needed to achieve an acceptable calibation. <br />A draft technical memorandum summarizing the steady state model calibration process and results <br />will be prepared and submitted to the Owner in PDF format for review. A teleconference will be <br />held with the Owner to review the draft technical memorandum with the project manager and <br />senior modeling engineer. The Owner’s comments will be incorporated into the final technical <br />memorandum. <br />Deliverables under this task include a draft and final technical memorandum and final <br />WaterGEMS model files. <br />Task 104 – Project Management and Administration <br />Provide project supervision, direction, and coordination with the Owner’s management and staff. <br />Project administration and management also includes budget and schedule control, document <br />control, coordination of activities, monthly invoicing and project close-out. Engineer will <br />maintain a change register of any scope changes affecting the project budget or schedule and <br />review it with the Owner on a monthly basis for up to five months. Engineer shall discuss and <br />receive written approval for any scope changes from the Owner prior to proceeding. <br />2.Consult with Owner to define and clarify Owner’s requirements for the Project and <br />available data. <br />3.Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />4.Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental assessment. <br />5.Identify and evaluate [insert specific number or list here] alternate solutions available to <br />Owner and, after consultation with Owner, recommend to Owner those solutions which in <br />Engineer’s judgment meet Owner’s requirements for the Project. <br />6.Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, and <br />related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />7.Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />[here list any such tasks or deliverables]