My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Traffic Analysis and Design Services for Sample & Mayflower – Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Traffic Analysis and Design Services for Sample & Mayflower – Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:31:49 AM
Creation date
10/27/2020 3:35:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 11 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , 2020. <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1— BASIC SERVICES <br />A1.01 Project Scope <br />The proposed project consists designing traffic improvements at the Mayflower Road and Sample Street <br />intersection to reduce current number of accidents. A capacity analysis of the existing intersection will be <br />done to determine the improvements needed for traffic signal assignments and lane requirements. The left <br />turn lanes will be realigned to be directly opposing one another removing the existing offset to provide <br />better visabilty of the on coming traffic. A new traffic signal system will be designed to replace the <br />existing aged system. The new traffic lane configuration will be analyized for large truck turning movents <br />on the existing pavement structure. <br />The project limits include 600 feet from the center of the Mayflower Road and Sample Street intersection. <br />The design of proposed improvements will include the following: <br />A topographic survey locating visable existing features within the right of way. Existing right of <br />way within the project limits will be determined using recorded deeds, plats, and field <br />monumentation. A Location Control Route Survey will be developed to establish the existing right <br />of way for this project. Utility field locations will be requested and the locates will be made part of <br />the topographic survey. When the survey is plotted it will be sent to all utilites of record for <br />verification. <br />A traffic analysis will be performed and presented for the intersection along with lane assignments, <br />signal timings and to determine if actutation is necessary. <br />Vehicle turning movements will be checked for large trucks. If additional pavement is required to <br />support the large truck tuning movements it will be designed in a future project and will be an <br />additional service. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />Page 1 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 9 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.