Laserfiche WebLink
<br /> <br />Page 4 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum Method <br />of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $177,861 based on the following estimated distribution of <br />compensation: <br />a. Phase 1 – Design and Bid Phase Services $126,081 <br />b. Phase 2 – Construction Phase Services $51,780 <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period. <br />B. Period of Service: The compensation amount stipulated in Compensation Packet BC-1 is <br />conditioned on a period of service not exceeding 18 months. If such period of service is extended, <br />the compensation amount for Engineer's services shall be appropriately adjusted.