Laserfiche WebLink
<br /> <br />Page 14 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />for the failure of any Contractor to perform or furnish the Work in accordance with the Contract <br />Documents. <br />A1.06 Post-Construction Phase <br />A. Upon written authorization from Ownerduring the Post-Construction Phase Engineer shall: <br />1. Together with Owner, visit the Project to observe any apparent defects in the Work, assist <br />Owner in consultations and discussions with Contractor concerning correction of any such <br />defects, and make recommendations as to replacement or correction of defective Work, if <br />any. <br />2. Together with Owner or Owner’s representative, visit the Project within one month before <br />the end of the correction period to ascertain whether any portion of the Work is subject to <br />correction. <br />3. Perform or provide the following additional Post-Construction Phase tasks or deliverables: <br />[Here list any such tasks or deliverables] <br />B. The Post-Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract’s correction period. <br />PART 2 – ADDITIONAL SERVICES <br />A2.01 Additional Services Requiring Owner’s Written Authorization <br /> <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional <br />Services of the types listed below. <br />1. Preparation of applications and supporting documents (in addition to those furnished under <br />Basic Services) for permits; private or governmental grants, loans, or advances in <br />connection with the Project; preparation or review of environmental assessments and <br />impact statements; review and evaluation of the effects on the design requirements for the <br />Project of any such statements and documents prepared by others; and assistance in <br />obtaining approvals of authorities having jurisdiction over the anticipated environmental <br />impact of the Project. <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or <br />to verify the accuracy of drawings or other information furnished by Owner or others. <br />3. Services resulting from significant changes in the scope, extent, or character of the portions <br />of the Project designed or specified by Engineer or its design requirements including, but <br />not limited to, changes in size, complexity, Owner’s schedule, character of construction, or