My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design, Bid, & Construction Services for North WTP Improv. Proj No. 119-011 - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design, Bid, & Construction Services for North WTP Improv. Proj No. 119-011 - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 3:35:09 PM
Creation date
10/27/2020 3:34:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT A, consisting of 17 pages, referred to in and part of the Agreement between <br />Owner and Engineer for Professional Services dated , . <br />Engineer’s Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1 – BASIC SERVICES <br />A1.01 Design, Bid and Construction Phase Services <br />A. Engineer shall: <br />B. Engineer’s services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. Standard text <br />deleted and new text inserted. <br />PHASE 1 - DESIGN AND BID PHASE SERVICES <br />Task 101 – Project Meetings <br />Engineer will attend up to a total of three project meetings with the Owner. The meetings will <br />be held with the Owner at the North WTP site in South Bend, Indiana to update the Owner on <br />project progress and obtain feedback on intermediate deliverables. The kickoff meeting will be <br />held with the Owner to discuss the goals and objectives of the project, to establish the lines of <br />communication, as well as gather data necessary to prepare the design documents. Up to two <br />progress meetings will be held to review the design and status of the project. Meetings will <br />correspond with the Basis of Design Memorandum/30 percent completion milestone and 90 <br />percent completion milestone. The kickoff meeting will be attended at the site by the project <br />manager, engineering manager and process engineer. The project manager and engineering <br />manager will attend the two design progress meetings. <br />Task 102 – Water Quality Evaluation <br />Engineer will review up to twelve months of the following data: <br />Recent raw water quality data for the North WTP supply wells, <br />Raw water quality data for the North WTP supply wells from a time period when <br />the plant was achieving their goals for finished water manganese, <br />Pretreatment chemical usage data, <br />Filter effluent chlorine residual data, and <br />Plant effluent manganese data and turbidity data. <br />Engineer will develop a testing protocol for the City to collect 2-months of Manganese <br />speciation data for Engineer’s review. All data will be provided by the Owner in Excel format.
The URL can be used to link to this page
Your browser does not support the video tag.