My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 10:23:03 AM
Creation date
10/27/2020 2:33:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contractor: Rieth-Riley <br />Date:10/14/2020 <br />Contract No:R -39540 INDIANA <br />Change Order No:002 Department of Transportation <br />Contract: R -39540 <br />Project: 1600074 - State:160007400LC4 <br />Change Order Nbr: 002 <br />Change Order Description: Water Meter/Valve Relocations <br />Reason Code: ERRORS & OMISSIONS, Design/Plan Related <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment <br />0148 1600074 0148 105-06807 LS 20,976.500 1.000 C <br />Item Description: ADDITIONAL <br />Supplemental Descriptionl : City of South Bend water meter structures and water services <br />Supplemental Description2: <br />Date:10/12/2020 <br />Page: 3 <br />Amount Change <br />Amount:$ 20,976.50 <br />Total Value for Change Order 002 = $ 20,976.50 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />Three City of South Bend water meter vaults for sprinkler systems at 808, 811 and 820 Ironwood Drive needed to be moved out of the new <br />widened roadway. Also three house City of South Bend service water shutoffs at 808, 811 and 822 Ironwood Drive needed to be moved behind <br />the new curb for the widened roadway. Also a 2" water service to the church at 915 Ironwood Dr. needed to be lowered for the new storm sewer. <br />Price includes hauling off abandoned water meter vaults that were removed from beneath new roadway location. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. Digitally signed by Jamie Plunkett <br />Jamie Plunkett ON: C=US, E=Cp tr cti ey -So <br />O=RIeCN_d y i. Pi UGtlon Co..Ga., OU-South <br />Bend, CN=damie Plunkett <br />Signed By: oate:2020.10.14 09:28:28-04'00• <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.