My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 10:23:03 AM
Creation date
10/27/2020 2:33:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER REQUEST FORM <br />CONTRACT NO. R-39540 <br />UPON WRITTEN REQUEST FROM THE ENGINEER, PROVIDE ADDITIONAL DETAIL <br />F-- — <br />DATE RECEIVED REQUEST FOR SUBMITTAL DATE OF <br />i ADDITIONAL DETAIL [Select Date] ADDITIONAL DETAIL [Select Date] <br />DETAILED DESCRIPTION / JUSTIFICATION: <br />(Include location(s), actions of contractor, owner, and other stakeholders, key events and related couse(s), discoveries, <br />discussions, meetings, and effect on the contract if no action is taken. Also include references to key documents attached <br />or available to support this change order request.) <br />Click here to enter text. <br />PROPOSED SOLUTION — ADDITIONAL DETAILS: <br />(Include proposed scope of work, means & methods, materials, equipment, utility relocation required, subcontracted <br />scope and the effect on the contract schedule. Also include references to attached documents including, but not limited <br />to, sketches, calculations, photos, material information, and submittals and meeting minutes.) <br />Click here to enter text. <br />SIGNATURES <br />Contractor: <br />Name: (print) <br />(signature) Date: <br />Project Engineer/Supervisor: (signature is to acknowledge receipt of the document and does not signify agreement of the change order) <br />Name: (print) <br />(signature) Date: <br />NOTE: The Contractor and PE/s should retain a signed copy of this document for record. <br />pg. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.