My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Change Orders
>
Change Order Nos 2 & 3 - Corby Ironwood Rockne Intersection Improvement Proj No. 116-034 - Rieth Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 10:23:03 AM
Creation date
10/27/2020 2:33:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -39540 INDIANA <br />Change Order No:003 Department of Transportation <br />Contract: R -39540 <br />Project: 1600074 - State:160007400LC4 <br />Change Order Nbr: 003 <br />Change Order Description: Arborvitae Trees by Stormwater Basin <br />Reason Code: SCOPE CHANGES, Added Quantities/Items <br />CLN PCN PLN Item Code Unit Unit Price CO Oty Comment <br />0149 1600074 0149 622-01937 EACH 595.620 10.000 C <br />Item Description: PLANT <br />Supplemental Description-1 - Tree plantings in front of stormwater basin on Corby Blvd. <br />Supplemental Descriptionl: <br />Date:10/15/2020 <br />Page: 3 <br />Amount Change <br />Amount:$ 5,956.20 <br />Total Value for Change Order 003 = $ 5,956.20 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The City of South Bend added arborvitae trees along the fence line of the stormwater basin on Corby Blvd. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />oIpwry signed by Ja- PI-1 <br />❑- -th-R E=jplunMatl@na�h-Al OU=S <br />Jamie P l u n kett �.+h-R''ujn" "" �. a=5 he� <br />Rieth—Rile Construction Co.CN�eRun <br />Contractor: Y Signed By: Date: 2pgg.,o15M,3:56�400• <br />10/15/2020 <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.