Laserfiche WebLink
QUOTE TABULATIONNotre Dame Triangle Alley PavingProject No: 119‐057RFor Quotes Due:  September 22, 2020Item No.  Line Item Quantity UnitUnit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost1Milling, Up to 1.5"1,150SYD$1.35 $1,552.50 No Bid $11.00 $12,650.00 $9.50 $10,925.002HMA Surface, 9.5 mm – Type B166TONS$70.00 $11,620.00 No Bid $127.00 $21,082.00 $150.00 $24,900.003HMA for Patching10SYD$20.00 $200.00 No Bid $250.00 $2,500.00 $175.00 $1,750.004Tack Coat1TONS$10.00 $10.00 No Bid $465.00 $465.00 $150.00 $150.005Adjust Inlet to Grade7EA$350.00 $2,450.00 No Bid $450.00 $3,150.00 $250.00 $1,750.00Base Quote Total$15,832.50 $39,847.00 $39,475.00Item No.  Line Item Quantity UnitUnit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost1Patch, Infrared, 5 ft. by 7 ft. by 2 in. depth30EA$185.00 $5,550.00 $200.00 $6,000.00 $182.00 $5,460.00 No Bid2Cracks in Asphalt Pavement, Fill430LFT$0.65 $279.50 $1.00 $430.00 $2.85 $1,225.50 No Bid3Asphalt Emulsion2,600SYD$5.00 $13,000.00 $5.70 $14,820.00 $1.00 $2,600.00 No BidAlternate #1 Total$18,829.50 $21,250.00 $9,285.50I hereby certify that the above truly and accurately represents quotes received for this project on September 22, 2020Scott Kreeger, Engineer IAsphalt Restoration ServicesWalsh & Kelly, Inc.Non-Collusion AffadavitYYEngineer's EstimateBase QuoteAlternate #1Engineer's EstimateAsphalt Restoration ServicesWalsh & Kelly, Inc.Rieth‐Riley Construction Co., Inc.Rieth‐Riley Construction Co., Inc.*YNote*: On Alternate #1, Rieth‐Riley Construction provided unit pricing for products differing from the quote specifications.S:\Public Works\Projects\Projects by Year\2019 Projects\119‐057R Notre Dame Triangle Alley Paving (Rebid)\1 ‐ Admin\1 ‐ BPW Documents\ND_Alley Tab