My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - One (1) or More 2020 or Newer 27 Cubic Yard Single Arm Side Loading Refuse - Spec G - Pyramid Equipment
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Award Bids
>
Award Bid - One (1) or More 2020 or Newer 27 Cubic Yard Single Arm Side Loading Refuse - Spec G - Pyramid Equipment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 2:28:52 PM
Creation date
10/27/2020 2:28:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOARD OF PUBLIC WORKS <br />CITY OF SOUTH BEND, INDIANA <br />PUBLIC WORKS CONTRACT <br />THIS AGREEMENT, made and entered into this 27th Day of October, 2020, by and between, <br />Pyramid Equipment Inc., 211 South Prairie, Rolling Prairie, IN 46371, HEREINAFTER called the <br />Contractor, and the Board of Public Works herein called the "Board". <br />WITNESSETH: That the Contractor covenants and agrees to make the following improvement, <br />as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, <br />and Bid Proposals, all of which are set forth as a part of this Contract, for: <br />PROJECT NO. <br />DESCRIPTION: ONE (1) OR MORE, 2020 OR NEWER, 27 CUBIC YARD <br />SINGLE ARM SIDE LOADING REFUSE TRUCK – SPEC G <br />COMPLETION DATE: SEE SPECIFICATIONS <br />AMOUNT: $354,135 BASE BID PLUS ALTERNATE NOS. 1, 2, & 3 <br />FUNDING: PR-00002888 <br />The unit prices for this improvement were those prices as received and accepted by the Board on <br />the 8th Day of September, 2020. <br />The Contractor further agrees to notify the Engineer when this improvement is completed. This <br />notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final <br />acceptance of the improvement by the Engineer, the Contractors final estimate will be presented <br />to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of <br />a Waiver of Lien. <br />BOARD OF PUBLIC WORKS PYRAMID EQUIPMENT INC. <br />Gary A. Gilot, President Elizabeth A. Maradik, Member Printed Name <br />Therese J. Dorau, Member Jordan V. Gathers, Member Signature <br />Joseph R. Molnar, <br />Member <br />Attest: Linda M. Martin, <br />Clerk <br />CERTIFICATION (To be completed if Contractor is a Corporation) <br /> I,, certify that I am Secretary of the Corporation named as <br />Contractor herein; that who signed this Agreement on behalf of the Contractor <br />was then of said Corporation; that said agreement was duly signed for and in <br />behalf of said Corporation by authority of its governing body, and is within the scope of its <br />corporate powers. <br />Secretary Corporate Seal
The URL can be used to link to this page
Your browser does not support the video tag.