Laserfiche WebLink
1 <br />Elicia Feasel <br />From:Pat Lynch <patlynch@sbheritage.org> <br />Sent:Friday, September 20, 2019 10:59 AM <br />To:Elicia Feasel <br />Subject:RE: SBH Firehouse on Notre Dame Ave <br />Attachments:1900s photo.jpg <br />Elicia –  <br />At this point (for fall 2019) we’re only taking on the masonry work and maybe a bit of roof repair where the <br />chimney comes off. The balance of the work will be spring 2020.  <br />  <br /> The chimney was a later addition to handle a water heater when the original chimney was <br />removed. The masonry chimney is not attached to the building (1” gap) We are removing it <br />because it is not original and it is not needed. We will repair the soffit and roofline as required to bring it <br />back to its original configuration. <br /> Yes, the gutters are internal to the soffit and fascia trim. We will repair the opening left in the soffit <br />when the chimney is removed. This will allow us to take down one of the downspouts. The repair material will <br />be galvanized metal to match the existing. The decorative soffit brackets are wood and we will reproduce them <br />as needed at this patch area and as otherwise required where missing. <br />8. Roof material at the repair will be grey slate to match the existing adjacent. We will integrate our roof <br />underlayment (Grace Ice & Water Shield or equal) with the existing underlayment. Wood furring strips to <br />match existing. <br />9. Slate tile will be equivalent size and thickness to existing. Secured to furring strips. <br />   <br /> 11. The new entry door will be a Therma-Tru S2200 or similar. Painted. Here is an image of this product: <br /> <br /> <br />  <br /> 12. The two double hung windows up in the tower (facing north) will be repaired and painted. I think that <br />they are in better condition than my initial assessment.   <br />   <br /> 14. Sorry about that…. “OHD” is architect speak for Overhead Door. That’s the big garage door on <br />the front of the building.  <br />   <br />Signage – That’s not happening this year. Can we get approval on masonry and associated roof/soffit/gutter <br />work and not on the signage? A partial?  <br />Mechanical – we will vent the water heater through the same below grade hole used by the existing <br />chimney. The vent will come up through the ground adjacent to the building and terminate just above grade in <br />a PVC ‘candy-cane’ configuration.  <br />Electrical - That’s not happening this year. Can we get approval on masonry and roof and hold on the <br />lights? A partial?   <br />  <br />  <br />Pat Lynch