Laserfiche WebLink
NENC Firehouse - 803 Notre Dame Avenue <br />Preliminary scope and budget estimate <br />Work Description ref. #schedule Budget $ <br />Concrete <br />□Remove asphalt paving at east side. New concrete <br />approach, city sidewalk, and walkway <br />1 2020 $10,000.00 <br />Masonry <br />□5% repoint and approx. 100 bricks replaced 2 2019 $17,500.00 <br />including clean brick of ivy / clean and apply siloxane <br />sealant to all masonry <br />□Limestone sill and header repair / cleaning 3 2019 $3,000.00 <br />□Remove exterior chimney complete / patch.4 2019 $2,500.00 <br />Metals <br />□Gutters and downspouts - patch & repair at removed <br />chimney <br />4 2019 $5,000.00 <br />□Gutters and downspouts - general patch & repair 5 2020 <br />□Wrought iron porch brackets - clean & paint 6 2020 $2,000.00 <br />□Security grilles - remove & patch holes 7 2019 $1,000.00 <br />□Historically correct metal roof for hose tower 8 2020 $4,500.00 <br />Roofing <br />□10-20 tile (matching slate) replacement 9 2020 $7,500.00 <br />Carpentry <br />□Repair damaged fascia &soffit at removed chimney. 5 2019 $10,000.00 <br />□Repair damaged fascia and soffits - general 5 2020 <br />□Remove misc. mounts/brackets/conduit/signage 17 2020 <br />□Replace two entry doors/transoms w/ historically <br />appropriate units / panic hrdware <br />11 2020 $10,000.00 <br />□Replace hose tower windows / attic windows / oval <br />windows <br />12 2020 $17,500.00 <br />□Repair deteriorated "skirt" shake siding 13 2020 $18,000.00 <br />□Replace damaged/missing shakes = approx. 200 14 2020 $5,000.00 <br />□Remove existing signage at OHD 2020 <br />□Hose tower window repair 2020 <br />Painting <br />□All shakes plus hose tower - scrape & paint. Include <br />lead work <br />15 2020 $20,000.00 <br />Paint all exterior doors & trim (new & old)2020 <br />Strip/scrape prime paint all window trim;2020 <br />5/12/2017 (REVISED 9-2019)