My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amending Chapter 6 Building
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1992
>
Amending Chapter 6 Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2012 1:24:59 PM
Creation date
10/17/2012 1:24:51 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
2/10/1992
Ord-Res Number
8243-92
Bill Number
83-91
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and hydrodynamic loads and effects of buoyancy. Where floodproofing <br /> is utilized for a particular structure in accordance with this <br /> provision, a professional architect or engineer registered in the <br /> State of Indiana shall certify that the floodproofing methods are <br /> reasonably adequate to withstand the flood depth, pressures, <br /> velocities, impact and uplift forces, and other factors associated <br /> with the one hundred-year flood, and a record of such certificate <br /> shall be maintained by the department. <br /> ( 3) The following provision shall apply to new mobile <br /> home parks and mobile home subdivisions, to expansion of existing <br /> mobile home parks and mobile home subdivisions, to expansion of <br /> existing mobile home parks and mobile home subdivisions, to mobile <br /> homes located in other than a mobile home park or mobile home <br /> subdivisions whether repair, reconstruction or improvement of street, <br /> utilities, and pads equals to or exceeds fifty (50) percent of the <br /> value of the streets, utilities and pads before the repair, <br /> reconstruction or improvement was commenced. <br /> (a) Ground anchors for tie-downs shall be in <br /> accordance with the Mobile Home Manufacturers Association standards <br /> or standards determined by the Federal Insurance Administration in <br /> implementing the National Flood Insurance Program. <br /> (b) Stands or lots shall be elevated on compacted <br /> fill or on piles so that the pads are elevated to two (2) feet above <br /> the regulatory flood profile, as established by the Natural Resources <br /> Commission. <br /> (c) Adequate surface drainage and easy access for <br /> a hauler shall be provided. <br /> (d) In the instance of elevation of piles, lots <br /> shall be large enough to permit steps. Pile foundations shall be <br /> placed on stable soil no more than ten ( 10) feet apart, and steel <br /> reinforcements shall be provided for piles more than six (6) feet <br /> high. <br /> ( A 1 The f�,l l�a.�i nn r�r�eri c i Inc chn l l �r�r�l v �r mr�1i l o <br />
The URL can be used to link to this page
Your browser does not support the video tag.