Laserfiche WebLink
(a) Required in advance. No person shall perform or cause to be <br /> performed the installation or alteration of any electrical wiring or <br /> equipment on or within any building, structure or premises within the <br /> City without obtaining, in advance, a permit from the Department. <br /> (b) Where a person shall unlawfully proceed to do any work or <br /> installation without a permit as required herein, the applicable <br /> permit fee shall be tripled as a penalty. The payment of such <br /> penalty shall not release the person in default from any other <br /> penalties provided herein, nor from compliance with any relevant <br /> provisions of the municipal code. <br /> J26% (c) Fees. Each application for a permit for installation <br /> or alteration of electrical wiring or equipment shall be accompanied <br /> by fees in accordance with the schedule below: <br /> (1) Temporary service for construction: <br /> All amperage $ 7.00 <br /> (2) Switchboards and panel boards each, new and <br /> replaced: <br /> 60-amp $5.00 <br /> 100-amp . . . . . . . . . . . . . . . 7.00 <br /> 200-amp 9.00 <br /> 400-amp 12.00 <br /> 600-amp 15.00 <br /> Over 600-amp to 2,000 amp 20.00 <br /> Over 2,000 amp 25. 00 <br /> ( 3) Circuits (new or replaced: <br />