Laserfiche WebLink
01//. /4vbX X46/ 60X/X 4t4XXOt/ itt/0 4t/160/44$1404 <br /> 160i]A E$/ 09:0.X 091/f04/09 /0014400 04/14 / 0/14$ XX s64/95f/401 444 <br /> 1600X4, <br /> 7 5. A water softener dealer may only be issued a <br /> permit to install water softening equipment or apparatus. <br /> XO% (e) All plumbing installations requiring a permit shall be <br /> inspected by the plumbing inspector three (3) times, once each for <br /> underground work, rough-on work, and final completion. A complete <br /> line test shall also be supervised by the plumbing inspector. The <br /> plumbing permit holder shall notify the plumbing inspector at least <br /> twenty-four (24) hours in advance of the time the work is ready for <br /> inspection. If the work does not pass inspection, a reinspection fee <br /> of ten dollars ( $10. 00) shall be charged for each future inspection <br /> of that stage of work. (Code 1962, §9-3; Ord. No. 6162-77, §8; Ord. <br /> No. 6604-79, §§1, 2; Ord. No. 7005-81, §2, 4(3) ; Ord. No. 7304-84, <br /> 7(b) ; Ord. No. 7513-85, §§2, 3; Ord. No. 7696-86, §3; Ord. No. <br /> 7972-89, §3) <br /> ARTICLE 5. CONSTRUCTION PROJECT, <br /> TEMPORARY WALKWAYS <br /> Sec. 6-11. Permit requirements. <br /> (a) All temporary occupancy of public property as hereinafter <br /> provided for shall be considered and treated as being at the will of <br /> the City, and will be permitted only by special permit issued by the <br /> City Engineer. <br /> (b) No permit shall be issued until the applicant has executed <br /> and filed with the Board of Public Works and Safety a bond with <br /> proper securities approved by the Controller, in an amount to be <br /> designated by the Board, but in no case less than five thousand <br /> Ant 1 „-c ltq nnn nn) .....,,a; � ;,,.,,.,a �.. - ..a.......s r.. -. --- --� ■--- - <br />