Laserfiche WebLink
(e) The permit holder shall place any necessary devices such as <br /> barricades, warning signs, and lights when performing demolition work <br /> over, across, or upon public sidewalks. <br /> (f) The permit holder shall take all necessary precautions to <br /> protect public ways, public places, and other public property during <br /> the course of the work authorized by the demolition permit. The <br /> permit holder must repair or replace any public ways, public places, <br /> and other public property damaged during the demolition, to conform to <br /> current City specifications, with the work to be approved by the <br /> Public Works Department. <br /> (g) The permit holder shall cut off the sewer service <br /> connection to the main sewer line by plugging the sewer line with <br /> concrete sufficient to prevent a back-up leak. The permit holder <br /> shall notify the Department to inspect the sewer line plug before he <br /> begins back-filling. <br /> (h) After removing all materials and debris from any basement <br /> of a building to be demolished, the permit holder shall break up the <br /> basement floor sufficiently to assure free drainage of storm water and <br /> shall top basement walls three (3) feet below the finished grade. <br /> (i) No fire shall be permitted on the demolition site for the <br /> disposition of material resulting from the demolition. <br /> (j ) All debris and residue resulting from the demolition must <br /> be hauled away and deposited in an approved landfill before <br /> backfilling may begin; provided, however, that concrete and masonry <br /> from the top three (3) feet below grade level may remain if it is <br /> broken sufficiently to permit drainage and if it is put in the <br /> basement cavity area, with the maximum size pieces being two (2) feet <br /> square. <br /> (k) The permit holder shall fill to grade level and grade the <br /> lot with three (3) inches of top soil. Seeding must be done at the <br /> time the lot is graded; provided, however, that seeding shall not be <br /> required if a new building is scheduled to be constructed on the <br /> Acmnl i f-i nn ci+-A rui thi n Rix ( Al months after completion of the <br />