My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Market Contract - Materials and Installation for Pinhook Water Treatment Plant Exhaust Fans – Ideal Consolidated, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Open Market Contract - Materials and Installation for Pinhook Water Treatment Plant Exhaust Fans – Ideal Consolidated, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:03:20 AM
Creation date
10/14/2020 3:52:23 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, oTx aE�� <br />pip <br />CITY OF SOUTH BEND INDIANA <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: <br />PROJECT NO. <br />Pinhook Park WTP Improvements — Exhaust Fans <br />119-003A <br />QUOTES DUE September 22nd, 2020 at 9:30am local time <br />Open -market electronic quotes should be submitted to <br />fcavanau&southbendin.gov <br />(Must be completed for all quotes. Please type or print) <br />Date: ` 9/22/2020 Firm: Ideal Consolidated, Inc. <br />Address: 806 West Sample Street <br />City/State/Zip: South Bend, IN 46601 Telephone Number: ( 574 ) 282-1228 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />119-003A Pinhook Park WTP Improvements - Exhaust Fans <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works, Division of Engineering <br />and dated September 15th, 2020 for the sum of (enter the Total Quote as shown on the Proposal) <br />Twenty seven thousand & 00/100 (s 27,000.00 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quo is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachmen <br />By <br />(Signature) <br />Tim Stuver, Vice President <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this 13th. day of October, 20 20 <br />Subject to the following conditions: <br />BOARD OF M �RLJCWORKS <br />0.- A. c ior:.3 —ids t zb —,e J. n i. Mmnbcr — <br />tt 1- V-.a- <br />I7 iabclb .1 M adik, Mc bor Jo,dun V. C tl ,, Me ber <br />r.irrAr, oPT xi, <br />Joseph R. Mole Member— — <br />Linden M. Martin, Clerk <br />Version 2/14/2020 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.