My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 1:08:04 PM
Creation date
10/14/2020 1:07:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
\[źƭƷƚŅğƷĻƩΉğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻƚŅƚǒƩĻğƒΛYĻǤtĻƩƭƚƓƓĻƌΜ <br />hǝĻƩƷŷĻ\[ğƭƷЊЉĻğƩƭ <br />CurrentorActualFinalorCurrentProjectProjectProjectContract <br />EngineerDescription <br />ProjectNameCityST <br />CompletionDateContractAmountExecutiveManagerSuperintendentDelivery <br />Thewellisnowcapableofsupplyinganadditional10,000GPMto <br />GrandGulfNuclearStationRadialtheexistingPlantServiceWater(PSW)system.Reynoldsportionof <br />PortGibsonMS7/25/2012Burns&McDonnell$8,640,909LesArcherJohnHallJamesBartrumDesignBuild <br />Well#6theworkconsistedofthefollowingmajoritems:PumpingStation, <br />pumpdischargepiping,rawwatersupplyline,concreteslab,etc. <br />Newrawwaterintake&pumpstationforanexistingWater <br />TreatmentPlant.Replacethecurrentrawwaterintake&pump <br />station.Increasecapacity&providefuturecapacityof8.5MGDin <br />CMAR(Target <br />RawWaterIntake&PumpStationJeffersonCityMO5/7/2012Black&Veatch$7,817,324LesArcherAdamRalphJoelStillionsthenewrawwaterintake.Thewetwellwillbeapproximately19'in <br />Cost) <br />diameter&75'drwallinthemiddle,7'x7' <br />eepwithadivide <br />horseshoeshapedtunnelapproximately200'throughbedrocktoa <br />pointunderneaththeriver <br />SrPM:Paul <br />Burton,Adam <br />RalphwasCM <br />GenPowerLongviewPowerFacilityChesterEngineers(APumpStationswith8verticalturbinepumps <br />forDavidHammond/ <br />DunkardCreekDBWaterSupplyMaidsvilleWV2/23/2011memberoftheHatch$42,542,862LesArcherDesignBuild3horizontalsplitcasepumps <br />Supply/IntakeBudLandstrom <br />Intake,PipelinesGroup)83,000LF8"30"DIP&PVCSDR18 <br />andPatrick <br />StalkerwasCM <br />forPipeline <br />Thepurposeoftheprojectwastoupgradeandexpandtreatmentat <br />CiticoWaterTreatment.Theprojectmodifiedtheexistingbasins <br />DesignBid <br />CiticoWTPUpgradesPh1AChattanoogaTN12/15/2010CDMSmith$4,134,096LesArcherPaulBurtonAbeDonlinwithnewflocculationandsedimentationequipment,andinstalled <br />Build(DBB) <br />sitepipeworkwhilecontinuouslyprovidinguninterruptedwater <br />supplytotheentiredistributionsystem. <br />Projectincludestheconstructionofa15MGDreclaimedwater <br />pumpinganddistributionsystem.Notablefeaturesincludea <br />SandyCreekEnergyStationReclaimedWaterPumpStation,EffluentWaterpipelines,Terminal <br />PaulBurton&DesignBid <br />ReclaimedWater&EffluentSystemsRieselTX11/1/2010Freese&Nichols$24,890,323LesArcherRickButcherStoragePondforanewcoalfiredpowerstationoutsideWaco, <br />MikeBenterBuild(DBB) <br />ProjectLSPowerFacilityTexas.Projectspecificsincluded: <br />Pondsstoragecapacities45MG <br />PumpStationwith3pumps,eachratedat5,555GPM(+/8MGPD) <br />Thisprojectconsistsofanew2.0MGDhorizontalcollectorwell,well <br />house,caissonandofundergroundpipe.The19'diameter <br />precastpanelwellhouseand16'(ID)diametercaissonhas(4) <br />HowardRGreenDesignBidstainlesssteellateralstotaling700'and1spareportforadding <br />SiouxFallsWell62SiouxFallsSD10/20/2010$1,953,442LesArcherJohnHallJamesBartrum <br />CompanyBuild(DBB)anotherlateralinthefuureifneeded.Thecollectorwelluses(1) <br />t <br />100hpverticalpumpandavariablefrequencydrive(VFD)topump <br />thewatertoanexistingwatermainthatfeedstheSiouxFalls <br />WaterPurificationPlant. <br />Page | 29 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.