Laserfiche WebLink
COMPANY BACKGROUND AND QUALIFICATIONS <br />CITY OF SOUTH BEND: PINHOOK WTP IMPROVEMENTS PROJECT GUARANTEED SAVINGS CONTRACT <br />C.7 Identify Professional Engineersdirectly employedby the Providerresponsible forthis project. <br />Include license number of the person responsible for the project. <br />Professional Engineers are beneficial to construction companies because they have the ability to ensure that work is <br />constructed safely. That is why construction firms employ them and most are structural engineers. Our Professional <br />Engineers are designers with true process design experience and that enhances the value we bring to owners and the <br />GSC process. <br />The President of Reynolds, Les Archer, P.E., not only is our leader, he is a designer of water and wastewater facilities. <br />Scott Huber is also a PE licensed in the State of Indiana, PE# 79800187. Throughout his career he has designed <br />numerous wastewater treatment plants, plant upgrades, and pump stations for municipalities in Indiana and Illinois. <br />He has a Master’s Degree in environmental engineering and uses his technical and construction experience to solve <br />problems for owners. He will be leading Reynolds’ design collaboration efforts on the project. <br />SELF-PERFORMED SERVICES <br />C.8 Describe if the Provider is a manufacturer, contractor, or engineering firm. Clearly <br />delineate what services or products the Provider is including from their own company as part of <br />the project. <br />I n addition to being a Qualified GSC Provider, Reynolds is also the General Contractor for this project. Typically, we <br />self-perform 70 to 80% of the work with our own labor force. Historically, these capabilities have been critical to <br />achieving the lowest possible cost and adhering to a tight schedule. Reynolds typically self-performs the following <br />work items: <br />River intakes and pump stationsProcess equipment installation <br />Site excavation/earthwork/gradingValve and Pump Replacement <br />Carpentry <br />Yard piping of all types <br />Concrete forming and placing <br />Exposed process piping of all types <br />Structural steel and miscellaneous metalsSeeding and restoration <br />Pipeline installationStartup and testing <br /> <br />Reynolds recently completedof the Muncie Water <br />Treatment Plant project. The project included upgrades to <br />the treatment process and the addition of ultraviolet <br />disinfection, creating an additional layer of protection to the <br />system. Reynolds was the Design-Builder on the project. <br />Page | 11 <br /> <br />