My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />! <br /> Our Knowledge of the Existing Water Infrastructure – Due to recent WTP experience at the Olive <br />Street facility we know exactly what you expect from Bowen regarding safety, quality, and schedule. <br />for valve/actuator replacement. <br /> Our Traditional Presence <br />traditional bids in the area. We have had recent success at the Olive Street WTP and at the WWTP <br /> Quality Projects – We’ve been working on Indiana infrastructure for 53 years, and have stressed <br />workmanship can be seen at the Olive Street WTP project that Tony just completed. <br /> <br />more dollars to allocate to wish-list items. As you’ve seen on the Olive Street project, Tony is one of <br />our best working superintendents. He works hand in hand as part of the crew. His project leadership <br />position expedites schedule and lowers costs. <br /> Lowest Possible Cost – By choosing GSC, with us, the City will get the most value. Along with our <br />local vendor/subcontractor relationships, we propose one of the most competitive Provider fees in the <br />industry. For this project and any future South Bend Water system work, we propose an . <br />piping). He made all these upgrades without interrupting the operation of the plant. <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.