My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />b*!Fyqmbjo!ipx!uif!Qspwjefs!qmbot!up!beesftt!uif!hvbsbouff!gps!uijt!uzqf!pg!qspkfdu! <br />boe!ipx!ju!nffut!Joejbob!sfrvjsfnfout!pg!JD!47.2.23/6/ <br />A guarantee revolves around ensuring the project works as intended. If it does not, Bowen will <br />Bowen plans to address the guarantee for this project by using the same process that we have <br />also has experience implementing guarantees on over 100+ Guaranteed Savings Contracts in <br />Indiana (80+ with Bowen and 30+ with previous providers). Bowen will utilize our experience as we <br />address the guarantee for the City of South Bend. <br />All water, wastewater, and building Guaranteed Savings Contracts must show that the amount that the <br />governing body would spend on the project will not exceed the amount of savings from energy, water, <br />wastewater and other operating costs over a 20- year span. <br />After Bowen gathers the information needed for the Conservation Measures, we will share these <br />with the City and American Structurepoint. As it relates to this project, a conservation measure <br />life. All other work required to properly implement the conservation measure would be included in <br />the guarantee because it is “causally connected” (I.C.36-1-12.5-0.7). <br /> <br />c*!Eftdsjcf!uif!nfuipepmphz!vtfe!up!dpnqvuf!uif!fofshz!cbtfmjof/ <br />pricing/guarantee documents for comparison to the expected annual savings. Data would be taken <br />reduced their backwash cycles compared to the original. <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.