My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />wj*!!!Uif!Qspwjefs!nvtu!cf!dfsujgjfe!boe!nffu!uif!sfrvjsfnfout!pg!JD!5.24/7.5!boe!uif!SGR! <br />tvcnjuufe!nvtu!jodmvef!b!dpqz!pg!uif!gjsnt!dfsujgjdbujpo!pg!rvbmjgjdbujpo!jttvfe!voefs!JD! <br />5.24/7.5/ <br />wjj*!Jefoujgz!Qspgfttjpobm!Fohjoffst!ejsfdumz!fnqmpzfe!cz!uif!Qspwjefs!sftqpotjcmf!gps!uijt!qspkfdu/!! <br />Jodmvef!Mjdfotf!ovncfs!pg!uif!qfstpo!sftqpotjcmf!gps!uijt!qspkfdu/ <br />It is our understanding that the code requires the provider to employ at least one Professional Engineer <br />10303062) responsible for this project. <br />wjjj*!!Eftdsjcf!jg!uif!Qspwjefs!jt!b!nbovgbduvsfs-!dpousbdups-!ps!fohjoffsjoh!gjsn/!Dmfbsmz!efmjofbuf!! <br />!!xibu!tfswjdft!ps!qspevdut!uif!Qspwjefs!jt!jodmvejoh!gspn!uifjs!pxo!dpnqboz!bt!qbsu!pg!uif! <br />!!qspkfdu/ <br />is our intention to not only self-perform 100% of the Provider and General Contractor duties, but also self- <br />perform the construction work within our capabilities. Some of the work that Bowen will self-perform includes <br />site work, concrete, mechanical and equipment installation. We will accomplish this through our project <br />boilermakers, cement masons, iron workers and laborers. <br />Bowen will provide the below products and services as a part of this project: <br /> Bowen will provide all of the contract calculations required by the Indiana Department of Local <br />Government Finance (DLGF). Bowen has done so on 80+ previous Guaranteed Savings projects. <br /> Bowen will provide a detailed schedule and pricing throughout the entire project in an owner-driven <br />format. Our Viewpoint and P6 software allows our reports given to the City of South Bend to include as <br />little or as much detail as needed. <br /> <br />team throughout the GMP process. <br /> Bowen will provide all extra scope done through Savings for no additional fee. <br /> <br />services to customers at no charge. <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.