My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Masonry Improvement Gallery Buildings 1-4 Proj No. 120-036 - Berglund Construction Company
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - WWTP Masonry Improvement Gallery Buildings 1-4 Proj No. 120-036 - Berglund Construction Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:36:00 AM
Creation date
10/14/2020 12:45:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V_st wlW,wllwsll•me^d 1911 <br />berg 0randcc,corn <br />October 13, 2020 <br />RE: WWTP Masonry Improvements Gallery Buildings 1-4 <br />Good Faith Efforts <br />To Whom It May Concern, <br />At this time, we are unable to provide any minority participation on this project. The project <br />involves work for the following trade unions. After each trade union is an explanation of our <br />good faith effort to try and achieve minority participation. <br />- Masonry Repairs — Berglund Construction would self -perform 100% of this work. <br />However, we did research if there are any union subcontractors available in South <br />Bend who would be interested. None were able to be located and for that reason no <br />participation has been included. <br />- Concrete Repairs — Berglund Construction would self -perform 100% of this work. <br />However, we did research if there are any union subcontractors available in South <br />Bend who would be interested. None were able to be located and for that reason no <br />participation has been included. <br />- Window / Door Replacement — The project manual specified 3 manufactures to be <br />used. We reached out to these manufactures for approved installers that would be <br />minority. None were able to be located and for that reason no participation has been <br />included. <br />- Painting — The subcontractors that bid this work were not minority. For this reason, no <br />minority has been included. <br />- Roofing — Berglund Construction is signatory with the roofer's union. We were not <br />aware of any minority roofers in South Bend. For this reason, no minority was <br />included. <br />If any minority subcontractors become available, we would entertain partnering with them on <br />this project. However, at this time we are unable to provide any minority participation for the <br />reasons listed above. We feel that this substantially demonstrates our good faith effort. <br />Thank you, <br />John McHugh <br />J M/aw <br />w:sc;oawlrslw°) <br />
The URL can be used to link to this page
Your browser does not support the video tag.