My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Masonry Improvement Gallery Buildings 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - WWTP Masonry Improvement Gallery Buildings 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:38:57 AM
Creation date
10/14/2020 12:41:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Failure to submit to a drug or alcohol test when <br />requested to do so by the EAR <br />5. A New Employee/Applicant whose initial drug or <br />alcohol test is confirmed as a Positive Test shall pay all <br />costs for: <br />• Any follow-up testing required by the EAP <br />• Any return -to -duty testing <br />Any subsequent testing required by the EAR <br />ADDITIONAL CONSEOLM'NCES FOR MULTIPLE <br />NON -COMPLIANT EVENTS <br />If any Employee has three (3) or more Non -Compliant Events <br />within a twelve (12) consecutive month (rolling) period, the <br />Employee shall not be permitted to take a Return -to -Duty Test <br />until one (1) year after the most recent Non -Compliant Event <br />within such twelve (12) consecutive month period and the <br />Employee' BCRC Substance Abuse Card and status shall be <br />N/A for the same time period. In addition, such Employee must <br />complete an EAP-prescribed treatment program before returning <br />to work. <br />BCRC also performs on -site random testing pursuant to the <br />BCRC Onsite Substance Abuse Testing Addendum. The policies <br />set forth in such Addendum (and/or other testing agreements <br />with Owners) also impose additional consequences for Positive <br />Tests and/or other Non -Compliant Events. Such additional <br />consequences generally apply at the specific plants and locations <br />covered by such Addenda (and/or other testing agreements with <br />owners) and are in addition to any additional consequences set <br />forth in this BCRC Policy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.