My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Masonry Improvement Gallery Buildings 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - WWTP Masonry Improvement Gallery Buildings 1-4 Proj No. 120-036 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:38:57 AM
Creation date
10/14/2020 12:41:48 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PEACK <br />CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S BID FOR PUBLIC WORK <br />CHECKLIST FOR BIDDERS <br />Project Name WWTP Masonry Improvements Gallery Buildings 1-4 <br />Project No. 120-036 <br />For Bids Due October 13'2O2O <br />From time to time the South Bend Board of Public Works finds it necessary to reject abid because <br />it does not comply with statutory requirements. In preparing your bid, please use the following <br />checklist inorder tomake sure that your bid iadone inthe proper manner. <br />� Proper bid security included. The bidder has the option ofproviding either aCe�i�adCheck <br />VnrBid Bond. <br />Bid prepared onthe City ofSouth Bend Contractor's Bid for Public Work Form, completely <br />Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding |nvnobnantm <br />with Iran, Employment Eligibility Verification, Non-D isohminetion Commitment, and <br />Certification of use of United Sbabae Steel Products or Foundry Products. <br />Proof of MBEANBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not <br />met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBE/WBE Contacted <br />Form[[NVVBE-2.1]. <br />Acknowledge Receipt of2 Addendum(o)included with the bid. <br />All required additional information is included with the bid. <br />Proposal statements and other affidavits all signed by the proper party with name either <br />printed or typed underneath signature. <br />N/ This checklist submitted with the Bid. <br />This checklist is provided for bidder's use in assuring compliance with required <br />documentation; however, it does not include all specifications requirements and does not <br />relieve the bidder ofthe need toread and comply with the specifications. <br />Bidder: Sl8[ile Roofing d Sheet Metal Co.,INC. Date: 10-9-2020 <br />BvAuthorized Rep : <br />Signature: <br />Print Name &Title: Gerald Loriq8Kot-President <br />Vorsion4/2/2O19 Contractor's Bid for Public Works -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.