Laserfiche WebLink
9. Dedication <br />Upon completion of construction of the Section 2 water main, the Owner shall dedicate the <br />system to the City, inclusive of all water main system improvements as depicted in Exhibit C and <br />provide City with As-Builts of the water main and sanitary sewer systems. The water main system <br />shall be located in County right-of-way and have no obstructions for future maintenance and access <br />by the City. <br />The Owner agrees also to provide the City with any As -Built records in its possession for the <br />Section 1 of the Audubon Woods Subdivision (See, Exhibit G). The City has no record of the final <br />as-builts for the sewer and water system in Section 1 and the infrastructure was built and not <br />dedicated to the City. <br />The City understands that the Owner is not the successor in interest to the Section 1 developer. <br />However, the Owner has informed the City that it has some of the documentation from the Section <br />1 developer in its possession and is willing to provide such documentation to the City. <br />Upon City acceptance of the water systems and successful construction of the sewer system <br />for Section 2 by the Owner's contractor and receipt of the water main records the Owner has in its <br />possession for Section 1 development, the City will accept the construction records for Section 1 <br />as being complete, subject to the Owner placing the final hot mix asphalt surface on all the streets <br />in Section 2 of the Audubon Woods Subdivision. The City's formal completion affidavit as <br />provided by the Engineering Division's Permit Manager will be utilized for Section 2 water main <br />system. <br />The Owner understands the proposed and existing sanitary sewer and existing Lift Station shall <br />be maintained by the St. Joseph County Water and Sewer District and holds the City harmless in <br />