Laserfiche WebLink
Phase 1A and 1B covering all work performed or to be performed pursuant to this Agreement, and <br />such bond shall remain in effect for three (3) years after dedication as described in Section 8 below. <br />7. Term <br />Except as otherwise provided herein, this Agreement shall continue for a period of sixteen <br />(16) months from the Effective Date of this Agreement, or upon the issuance of the relevant <br />occupancy permit(s), whichever occurs last. <br />8. Dedication <br />Upon completion of the construction of the Future Improvements for Dedication, <br />substantially as depicted in Exhibit B, the Owner shall use its best efforts to work with the City to <br />ensure that the Dedicated Improvements of Phase 1A and 1B are dedicated to the City in a timely <br />manner. It is understood by Owner that no dedication shall be accepted by the City until all required <br />easements have been conveyed, accepted, and recorded by the City. Additionally, prior to <br />dedication, the following must be satisfied: <br />a. All parts and labor must meet the requirements stated in the design specifications as <br />presented to and approved by the City Engineering Department. <br />b. Owner must provide copies of test reports or cut sheets on all materials supplied. <br />c. Lien waivers must be received with regard to all work and materials used in connection <br />with these improvements. <br />d. The Completion Affidavit must be furnished to Owner by the Board of Public Works. <br />e. Owner must provide As-Built drawings in accordance with the City of South Bend <br />Prevailing Specifications for Public Works, which may be found at <br /> <br />