My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dedicated Improvements Agreement - Provides City w Performance Bond Work at DT Library Branch in Right-of-Way - SJCL
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Dedicated Improvements Agreement - Provides City w Performance Bond Work at DT Library Branch in Right-of-Way - SJCL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 3:10:11 PM
Creation date
9/23/2020 3:10:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
covering all work performedor to be performed pursuant to this Agreement, and such bond shall <br />remain in effect for three (3) years after dedication as described in Section 6 below. <br />6.Term <br />Except as otherwise provided herein, this Agreement shall continue for a period of sixteen <br />(16) months from the Effective Date of this Agreement, or upon the issuance ofthe relevant <br />occupancy permit(s), whichever occurs last. <br />7.Dedication <br />The Owner understands the dedication of the Dedicated Improvementsto the City is a <br />requirement foroccupancy. Upon completion of the construction of the Dedicated Improvements, <br />substantiallyas depicted in Exhibit A, the Owner shall use its best efforts to work with the City to <br />ensure that the Dedicated Improvements arededicated to the City in a timely manner. It is <br />understood by Owner that no dedication shall be accepted by the Cityuntil allrequired easements <br />have been conveyed, accepted,and recorded by the City.Additionally, prior to dedication, the <br />following must be satisfied: <br />a.All parts and labor must meet the requirements stated in the design specifications as <br />presented to and approved by the City Engineering Department. <br />b.Owner must provide copies of test reports or cut sheets on all materials supplied. <br />c.Owner must provide As-Built drawings in accordance with the City of South Bend <br />Construction Standards and Specifications, which may be found at <br />https://southbendin.gov/wp-content/uploads/2019/10/SBN-SPEC-FINAL-101719.pdf <br />Owner’s failure to comply with this Section 6 shall be a material breach of this Agreement. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.