Laserfiche WebLink
2.Cardno will amend the North Shore Bank Stabilization design plans and specifications with the addition <br />of the INDOT guardrail. Cardno will review the INDOT standard drawings (Drawing Series E 601), <br />previously approved and stamped by INDOT engineers, to confirm existing conditions along North Shore <br />Drive support minimum requirements of INDOT. Cardno will review and amend INDOT standard <br />specifications (Section 601) for guardrail to fit the existing conditions and specific construction <br />considerations required along North Shore Drive. Assuming that INDOT standard drawings and <br />specifications are utilized in this guardrail design process, Cardno does not anticipate INDOT review <br />being required and this review is not reflected in the below fixed fee amount. Should INDOT review be <br />required, Cardno reserves the right to negotiate this scope change with the Client. This fixed fee amount <br />does reflect time for the City of South Bend’s internal review process. <br />DELIVERABLES <br />1.Preliminary submittal of plan view, standard detail and construction specifications related to guardrail <br />installation. Submittal to be reviewed by City of South Bend. <br />2.Final 100% plans for the North Shore Bank Stabilization to include plan view and typical detail for <br />guardrail installation. <br />3.Final 100% specifications for the North Shore Bank Stabilization project to include construction <br />guidance for guardrail installation. <br />The following fixed fee represents Cardno’s labor and expenses: $5,000 <br />Current Project Budget: $99,600.00 <br />Additional Fee Requested: $5,000.00 <br />New Total Project Budget: $104,600.00 <br />Cardno, Inc. <br /> <br />