My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to Owner-Engineer Agreement - Design Services for CSB Wayfinding Signs – Jones Petrie Rafinski Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to Owner-Engineer Agreement - Design Services for CSB Wayfinding Signs – Jones Petrie Rafinski Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:38:31 AM
Creation date
9/23/2020 3:05:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 19, 2020. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: May 28,2019 <br />b. Owner: Citv of South Bend <br />C. Engineer: <br />Jones Petrie Rabnski <br />d. Project: Downtown South Bend Wayfinding Phase 11 <br />2. Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Conduct site visits with City staff to identify locations of additional wayfinding <br />signage. <br />2) Prepare the plans and special provisions for the additional wayfinding signs. <br />Construction documents are to include foundation designs and location plans. <br />These details will be based on the previously developed sign designs. <br />3) Prepare bid documents for the kiosk and wayfinding sign including the foundation <br />design, fabrication and installation of the proposed signs, and minor electrical <br />services to select lit signs. <br />4) Phase 11 signs are to include the following: <br />i. 2 lighted gateway welcome to SB signs <br />ii. 22 vehicular multi -message guides (19 on decorative poles, 3 on INDOT <br />beams) <br />iii. 10 vehicular trailblazers (8 on decorative poles, 2 on INDOT beams) <br />iv. 2 vehicular trailblazers on existing poles <br />V. 2 pedestrian kiosks <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />1) Previous authorized scope of services included the preparation of plans and special <br />provisions for the South Bend Wayfinding Phase 1 project. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.