Laserfiche WebLink
performance characteristics. Failure of an emulsion to perform satisfactorily in the field shall be <br />cause for rejection, even though it passes laboratory tests. <br />2.The area shall be swept clean prior to the application of asphalt emulsion. <br />3. All drain covers, inlets, manholes shall be covered prior to the application of asphalt emulsion. <br />4. The Contractor shall be responsible for the clean-up of any asphalt emulsion applied onto driveway <br />approaches, curb ramps, and other surfaces outside of the project limits at no additional expense <br />to the City. <br />5. Payment shall be made at the Unit Price as specified in the proposal as follows: <br /> <br />Asphalt EmulsionSYS <br /> <br />XXI. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br /> <br />1. The plans consist of 4 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br />Version 4/2/2019 Page - 10 Public Works Quote <br /> <br />