My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Notre Dame Triangle Alley Paving Proj No. 119-057R - Asphalt Restoration Services, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Notre Dame Triangle Alley Paving Proj No. 119-057R - Asphalt Restoration Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 2:04:16 PM
Creation date
9/23/2020 2:04:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
performance characteristics. Failure of an emulsion to perform satisfactorily in the field shall be <br />cause for rejection, even though it passes laboratory tests. <br />2.The area shall be swept clean prior to the application of asphalt emulsion. <br />3. All drain covers, inlets, manholes shall be covered prior to the application of asphalt emulsion. <br />4. The Contractor shall be responsible for the clean-up of any asphalt emulsion applied onto driveway <br />approaches, curb ramps, and other surfaces outside of the project limits at no additional expense <br />to the City. <br />5. Payment shall be made at the Unit Price as specified in the proposal as follows: <br /> <br />Asphalt EmulsionSYS <br /> <br />XXI. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br /> <br />1. The plans consist of 4 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br />Version 4/2/2019 Page - 10 Public Works Quote <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.