My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />3. Substrates that product is known to satisfactorily adhere to and with which it is <br />compatible. <br />4. Substrates the product should not be used on. <br />5. Substrates for which use of primer is required. <br />6. Sample product warranty. <br />7. Certification by manufacturer indicating that product complies with specification <br />requirements. <br />C. Color Cards for Selection: Where sealant color is not specified, submit manufacturer's color <br />cards showing standard colors available for selection. <br />D. Samples for Verification: Where custom sealant color is specified, obtain directions from <br />Architect and submit at least two physical samples for verification of color of each required <br />sealant. <br />E. Preconstruction Laboratory Test Reports: Submit at least four weeks prior to start of <br />installation. <br />F. Preinstallation Field Adhesion Test Plan: Submit at least two weeks prior to start of <br />installation. <br />G. Preinstallation Field Adhesion Test Reports: Submit filled out Preinstallation Field Adhesion <br />Test Reports log within 10 days after completion of tests; include bagged test samples and <br />photographic records. <br />1.5 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: Company specializing in manufacturing the products specified in <br />this section with minimum three years documented experience. <br />B. Installer Qualifications: Company specializing in performing the work of this section and with <br />at least three years of documented experience. <br />C. Preconstruction Laboratory Testing: Arrange for sealant manufacturer(s) to test each <br />combination of sealant, substrate, backing, and accessories. <br />1. Adhesion Testing: In accordance with ASTM C794. <br />2. Compatibility Testing: In accordance with ASTM C1087. <br />3. Allow sufficient time for testing to avoid delaying the work. <br />4. Deliver to manufacturer sufficient samples for testing. <br />5. Report manufacturer's recommended corrective measures, if any, including primers or <br />techniques not indicated in product data submittals. <br />6. Testing is not required if sealant manufacturer provides data showing previous testing, <br />not older than 24 months, that shows satisfactory adhesion, lack of staining, and <br />compatibility. <br />D. Preinstallation Field Adhesion Test Plan: Include destructive field adhesion testing of one <br />sample of each combination of sealant type and substrate, except interior acrylic latex sealants, <br />and include the following for each tested sample. <br />1. Identification of testing agency. <br />JOINT SEALANTS 07 9200 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.