My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />2. Setting of Support Pedestal units signifies acceptance of building roof membrane and <br />protection board substrates. <br />3.2 PREPARATION <br />A. Keep area where Roof Paver Pedestal System is to be constructed free from nails, screws, <br />debris, etc. during entire job. Repair all damage to roof substrate. <br />B. Complete construction of all roof drain inlets and other drainage structures before the <br />commencement of Support Pedestal System installation. <br />C. Do not damage roof drains, roof substrate, and/or other drainage appurtenances during <br />installation. Report all damage immediately. <br />D. Protect HVAC, ventilation pipes and other structures during Roof Concrete Paver and Support <br />Pedestal System installation. <br />E. Clean and free projections and debris impairing the performance of the pedestals or the total <br />system from the substrate. <br />F. Establish accurate lines, levels and pattern. <br />G. G. Installation requirements vary for each individual project site. Provide Roof Concrete Pavers <br />materials used, pattern, grid layout, starting point, and finished elevation on plan view shop <br />drawings which have been prepared and approved. <br />H. Establish a starting point and the finished elevation of the Roof Concrete Paver surface. Mark <br />the Support Pedestal System elevation (finished elevation minus paver material thickness) <br />around the perimeter using a transit "torpedo" water level or laser leveling device. <br />L Define the paver surface area by accurately taking precise measurements. Mark off and square <br />all outside edges with control lines (chalk lines or spray paint). Install two (2) lines that are <br />perpendicular to each other across the paver surface area. Continue to mark a grid of lines in <br />both directions marking the location of each pedestal. Implement control lines as references to <br />periodically check the layout during installation to assure a square layout. <br />3.3 INSTALLATION <br />A. PEDESTAL SYSTEM <br />Install in accordance with manufacturer's instructions. <br />2. If required, place a Floating Insulation Base (FIB) board or Floating Foundation Base <br />(FFB) in the location on the grid of each pedestal. <br />3. Place a Support Pedestal where each measured grid line meets the perimeter. <br />a. Remove two (2) spacer tabs in line with one another on top of each pedestal <br />placed around the perimeter. <br />b. Remove all four (4) spacer tabs at corners. <br />4. Adjust each Support Pedestal to a "top of pedestal" elevation marked around the <br />perimeter. (Normally the deck support is positioned as close to the perimeter as possible, <br />with the two remaining spacer tabs aligned with the grid line.) Stretch a string line along <br />ROOF CONCRETE PAVERS 07 7600 - 7 <br />PEDESTAL SYSTEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.