My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />D. Expanded Polystyrene (EPS) Board Insulation: Complies with ASTM C578. <br />1. Board Thickness: 2 inches. <br />2. Board Edges: Square. <br />3. Type and Thermal Resistance, R-value (RSI-value): Type XI, 3.1 (0.55) per 1 inch <br />thickness at 75 degrees F mean temperature using ASTM C177 test method. <br />4. Type and Board Density: Type XI, 0.70 pcf (12 kg/cu m), minimum. <br />5. Type and Compressive Resistance: Type XI, 5 psi (35 kPa), minimum. <br />6. Surface Burning Characteristics: Flame spread/Smoke developed index of 25/450, when <br />tested in accordance with ASTM E84. <br />2.4 ACCESSORY MATERIALS <br />A. Insulation Adhesive: Type required by EIFS manufacturer for project substrate. <br />B. Perforated Base Insulation Hangers: 12 guage annealed low carbon steel pin on 2" x 2" square <br />galvanized steel plate with round perforations. Length as required for insulation board. <br />1. Provide locking washer to hole insulation in place. <br />C. Pin Adhesive: Formulated to bond insulation hangers to concrete. <br />D. Trim: EIFS manufacturer's standard PVC or galvanized steel trim accessories, as required for a <br />complete project and including starter track and drainage accessories. <br />E. Sealant Materials: Compatible with EIFS materials and as recommended by EIFS <br />manufacturer. <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Verify that substrate is sound and free of oil, dirt, other surface contaminants, efflorescence, <br />loose materials, or protrusions that could interfere with EIFS installation and is of a type and <br />construction that is acceptable to EIFS manufacturer. Do not begin work until substrate and <br />adjacent materials are complete and thoroughly dry. <br />B. Verify that substrate surface is flat, with no deviation greater than 1/4 in when tested with a 10 <br />ft straightedge. <br />3.2 INSTALLATION - GENERAL <br />A. Install in accordance with EIFS manufacturer's instructions and ASTM C1397. <br />I. Where different requirements appear in either document, comply with the most stringent. <br />2. Neither of these documents supercedes provisions of Contract Documents that defines <br />contractual relationships between parties or scope of this work. <br />EXTERIOR INSULATION AND 07 2400 - 4 <br />FINISH SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.