My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />H. Pigments for Colored Mortar: Pure, concentrated mineral pigments specifically intended for <br />mixing into mortar and complying with ASTM C979/C979M. <br />L Water: Clean and potable. <br />2.3 MORTAR MIXING <br />A. Thoroughly mix mortar ingredients using mechanical batch mixer, in accordance with ASTM <br />C270 and in quantities needed for immediate use. <br />B. Maintain sand uniformly damp immediately before the mixing process. <br />C. Do not use anti -freeze compounds to lower the freezing point of mortar. <br />D. If water is lost by evaporation, re -temper only within two hours of mixing. <br />PART 3 EXECUTION <br />3.1 INSTALLATION <br />A. Install mortar to requirements of section(s) in which masonry is specified. <br />END OF SECTION <br />MORTAR AND MASONRY 040511 - 3 <br />GROUT <br />
The URL can be used to link to this page
Your browser does not support the video tag.