My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />SECTION 02 4100 - DEMOLITION <br />PART 3 EXECUTION <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />1.1 GENERAL PROCEDURES AND PROJECT CONDITIONS <br />A. Comply with applicable codes and regulations for demolition operations and safety of adjacent <br />structures and the public. <br />1. Obtain required permits. <br />2. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be <br />removed; do not allow worker or public access within range of potential collapse of <br />unstable structures. <br />3. Provide, erect, and maintain temporary barriers and security devices. <br />4. Conduct operations to minimize effects on and interference with adjacent structures and <br />occupants. <br />5. Do not close or obstruct roadways or sidewalks without permit. <br />6. Conduct operations to minimize obstruction of public and private entrances and exits; do <br />not obstruct required exits at any time; protect persons using entrances and exits from <br />removal operations. <br />7. Obtain written permission from owners of adjacent properties when demolition <br />equipment will traverse, infringe upon or limit access to their property. <br />B. Do not begin removal until receipt of notification to proceed from Owner. <br />C. Protect existing structures and other elements that are not to be removed. <br />1. Provide bracing and shoring. <br />2. Prevent movement or settlement of adjacent structures. <br />3. Stop work immediately if adjacent structures appear to be in danger. <br />1.2 DEBRIS AND WASTE REMOVAL <br />A. Remove debris, junk, and trash from site. <br />B. Leave site in clean condition, ready for subsequent work. <br />C. Clean up spillage and wind-blown debris from public and private lands. <br />END OF SECTION <br />DEMOLITION 02 4100 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.