My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />L At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal <br />voids with fire rated material in accordance with Section 07 8400, to full thickness of the <br />penetrated element. <br />Patching: <br />1. Finish patched surfaces to match finish that existed prior to patching. On continuous <br />surfaces, refinish to nearest intersection or natural break. For an assembly, refinish <br />entire unit. <br />2. Match color, texture, and appearance. <br />Repair patched surfaces that are damaged, lifted, discolored, or showing other <br />imperfections due to patching work. If defects are due to condition of substrate, repair <br />substrate prior to repairing finish. <br />3.6 PROGRESS CLEANING <br />A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly <br />condition. <br />B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or <br />remote spaces, prior to enclosing the space. <br />C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning <br />to eliminate dust. <br />D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and <br />dispose off -site; do not burn or bury. <br />3.7 PROTECTION OF INSTALLED WORK <br />A. Protect installed work from damage by construction operations. <br />B. Provide special protection where specified in individual specification sections. <br />C. Provide temporary and removable protection for installed products. Control activity in <br />immediate work area to prevent damage. <br />D. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings. <br />E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement <br />of heavy objects, by protecting with durable sheet materials. <br />F. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is <br />necessary, obtain recommendations for protection from waterproofing or roofing material <br />manufacturer. <br />G. Remove protective coverings when no longer needed; reuse or recycle coverings if possible. <br />3.8 ADJUSTING <br />A. Adjust operating products and equipment to ensure smooth and unhindered operation. <br />EXECUTION AND CLOSEOUT 01 7000 - 5 <br />REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.