My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 <br />South Bend, Indiana <br />1. Design data. <br />2. Certificates. <br />3. Test reports. <br />4. Inspection reports. <br />5. Manufacturer's instructions. <br />6. Manufacturer's field reports. <br />7. Other types indicated. <br />© Copyright, Kil Architecture / Planning <br />September 2020 <br />B. Submit for Architect's knowledge as contract administrator or for Owner. <br />3.6 SUBMITTALS FOR PROJECT CLOSEOUT <br />A. Submit Correction Punch List for Substantial Completion. <br />B. Submit Final Correction Punch List for Substantial Completion. <br />C. When the following are specified in individual sections, submit them at project closeout in <br />compliance with requirements of Section 017800 - Closeout Submittals: <br />1. Project record documents. <br />2. Operation and maintenance data. <br />3. Warranties. <br />4. Bonds. <br />5. Other types as indicated. <br />D. Submit for Owner's benefit during and after project completion. <br />3.7 NUMBER OF COPIES OF SUBMITTALS <br />A. Electronic Documents: Submit one electronic copy in PDF format; an electronically -marked up <br />file will be returned. Create PDFs at native size and right -side up; illegible files will be <br />rejected. <br />B. Extra Copies at Project Closeout: See Section 01 7800. <br />C. Samples: Submit the number specified in individual specification sections; one of which will <br />be retained by Architect. <br />1. After review, produce duplicates. <br />2. Retained samples will not be returned to Contractor unless specifically so stated. <br />3.8 SUBMITTAL PROCEDURES <br />A. General Requirements: <br />1. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail <br />number; and specification section number and article/paragraph, as appropriate on each <br />copy. <br />2. Apply Contractor's stamp, signed or initialed certifying that review, approval, <br />verification of products required, field dimensions, adjacent construction work, and <br />ADMINISTRATIVE 01 3000 - 4 <br />REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.