Laserfiche WebLink
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />1. Submit documentation from Roofing System Manufacturer affirming warranty of <br />finished installation and repair of roofing system. <br />C. Allow for erection loads, and for sufficient temporary bracing to maintain true alignment until <br />completion of erection and installation of permanent attachments. <br />D. Provide welded field joints where specifically indicated on drawings. Perform field welding in <br />accordance with AWS D1.1/D1.1M. <br />E. Other field joints may be either welded or bolted provided the result complies with the <br />limitations specified for jointing quality levels. <br />F. Obtain approval prior to site cutting or creating adjustments not scheduled. <br />G. After erection, prime welds, abrasions, and surfaces not shop primed or galvanized, except <br />surfaces to be in contact with concrete. <br />END OF SECTION <br />METAL STAIRS 05 5100 - 5 <br />