My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Addendum #1 <br />Date: September 3, 2020 <br />To: All Bidders and others to whom Plans & Specifications have been issued <br />From: Kil Architecture/ Planning <br />Gregory A. Kil, AIA, NCARB <br />Architect <br />RE: Liberty Tower Exterior Renovations — Ph 2 - Project 120-047 <br />For City of South Bend, Board of Public Works <br />227 W. Jefferson Blvd, Room 1316 <br />South Bend, IN 46601 <br />This addendum forms part of the Contract Documents and modifies the original Bidding Documents only <br />as noted below. The remainder of the drawings and Specifications are to remain in their entirety. <br />Acknowledge receipt of this addendum in the space provided on the Bid Form. This addendum consists <br />of the following changes identified in bold: <br />r-'GniGooi <br />A. The due date for quotes to be submitted electronically has been changed from September 8, <br />2020 to September 22, 2020 at 9:30 AM. They will be opened by the Board of Public Works at <br />that time. <br />B. Contractors may inspect the existing conditions at the 7th Floor Roof. Contact Facilities Manager <br />Josh Overholtzer at (574) 276-1795. <br />C. A bid bond is not required. <br />D. A performance bond is not required. <br />PROJECT MANUAL: <br />A. Specification Section 05 5000, Metal Fabrications <br />1. Omit Section 05 5000 in it's entirety. <br />B. Insert new Specification Section 05 5100, Metal Stairs <br />DRAWINGS: <br />A. Drawing A1.2, 7th Floor Roof Plan: <br />1. Omit drawing A1.2 and substitute attached drawing A1.2, Revision 1. <br />B. Drawing A2.1, Roof Details: <br />1. Omit drawing A2.1 and substitute attached drawing A2.1, Revision 1. <br />C. Drawing A4.2, Exterior Details: <br />K I L <br />ARCHITECTURE <br />PLANNING <br />www.kilarchitecture.com <br />Addendum #1 <br />page 1 <br />1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289. 2420 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.