My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
metaltreatmentprocess shallbetreatedon-sitetoremove any other heavymetals. <br />- Particulateemission collectionfrom sanding operations shall have a 99.99% <br />efficiency factor. <br />- Particulateemissionsfrom paintingoperations shallbe collected bya dryfilteror <br />water wash process.Ifthedryfiltermeans isused,it shallhaveanefficiency rating of <br />98.00%. Water washsystemsshallbe 99.97%efficient. <br />- Waterfrom water washboothsshallbereused. Solids shallberemovedmechanically <br />on a continual basistokeep the waterclean. <br />-Paint wastesaredisposedof inanenvironmentallysafemanner. Theyareusedas fuel <br />in kilns used inthecementmanufacturing process- therebyextracting energyfrom a <br />wastematerial. <br />- Emptymetal paintcontainersshallbecleaned,crushed and recycled torecover the <br />metal. <br />- Solvents usedin cleanupoperationsshallbe collected, recycled on-site, orsentoff- <br />site fordistillation and returned forreuse. Residuefrom the distillation operationshall <br />be used asfuelin off-sitecementkilns. <br />Additionally, thefinishedapparatus shallnotbemanufacturedwithorcontainproducts that <br />haveozonedepletingsubstances. Contractor shall, upon demand,present evidence that his <br />manufacturing facilitymeets theabove conditions andthatitisin compliance withhisState <br />EPA rules andregulations. <br />YES/NO <br />PAINT CHASSIS FRAME ASSEMBLY <br />The chassisframeassembly shallbe painted whitecolor before the installationofthecab and <br />body, and before installation of theengine, drive shafts and transmissionassembly, air brake <br />lines,electricalwireharnesses,etc. Componentsthatareincludedwiththechassis frame <br />assemblythat shallbe painted white,areframe rails,crossmembers, axles, suspension, <br />steering gear,bodysubstructure supports, miscellaneous mountingbrackets,etc. <br />COMPARTMENT LINING <br />YES/NO <br />Thereshallbeeight (8) interior bodycompartment(s) thatshall belinedwith"Line-X" or <br />equal spray onpolyurethane/polyureamaterialallseven body compartments. Color to be <br />grey. <br />REFLECTIVE STRIPES <br />YES/NO <br />Three(3) reflective stripesshall beprovided across the frontof the vehicleandalong the <br />sides ofthe body. Thereflective band shall consistofa 1.00" whitestripeatthetop witha <br />1.00"gapthena 6.00" white stripe with a 1.00" gapand a 1.00" whitestripe onthe bottom. <br />CHEVRON STRIPING,REAR <br />YES/NO <br />Thereshallbealternatingchevron stripinglocated on the rear-facing vertical surface ofthe <br />apparatus. Therearsurface, excluding therearcompartment door, shall becovered. <br />The colors shall beredandfluorescent yellow greendiamond grade. <br />Eachstripeshallbe 6.00" in width. <br />Thisshallmeettherequirementsof NFPA 1901,2009 edition, whichstatesthat50%of the <br />rear surfaceshallbe covered withchevronstriping. <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.