My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The elbow shall incorporate a thread design toautomaticallyrelievestored pressurein thelineYES/NO <br />when disconnected. <br />ELBOW, 4.00" OUTLET <br />The 4.00" outletshallbe furnishedwitha 4.00"(F) National Standard hosethreadx 5.00" <br />Storz elbow adapter withStorzcap. <br />YES/NO <br />ADAPTER <br />Thereshallbethree (3) adapters with 1.50" FNST X IPT threadson 1.5" outlets.These <br />adapters shall beinstalledon bothcrosslaydischargesand thefront bumper discharge,all <br />adapters tobe chromeplated. <br />Thereshallbesix(6)adapterswith2.50" FNST x 1.50" MNPSH Chrome andcap. These <br />adapters shall beinstalledon all 2.50"discharges. <br />YES/NO <br />DISCHARGEOUTLET CONTROLS <br />The dischargeoutletsshallincorporate a quarter-turn ballvalve withthecontrol locatedat <br />the pumpoperator's panel.The valve operatingmechanism shall indicate the positionofthe <br />valve. <br />If a handwheelcontrol valve is used,the control shallbe a minimumof a3.9" diameter <br />chromeplatedhandwheelwith adial position indicator built intothecenter of the <br />YES/NO <br />handwheel. <br />DELUGE RISER <br />A 3.00" delugerisershallbe installed abovethe pumpin such amannerthat amonitorcan be <br />mountedand usedeffectively. Piping shallbeinstalledsecurely so no movementdevelops <br />when thelineischarged.Theriser shall be gated andcontrolledatthe pumpoperator'spanel. <br />YES/NO <br />LOW WATER LEVELALARM <br />An audiblealarm shall be includedthat shallsoundwhen the waterleveldropsbelow one <br />YES/NO <br />eighthof atank. <br />COLOR CODING <br />Eachdischarge valvecontrol, outlet,and corresponding gaugeshallbe color-coded. The <br />color-coding shall be: <br />#1 Discharge – Tobe determinedin pre-build <br />#2 Discharge – Tobe determinedin pre-build <br />#3 Discharge(Whereapplicable) – To be determinedin pre-build <br />#4 Discharge(Whereapplicable)- To be determined in pre-build <br />#5 Discharge(Whereapplicable)- To be determined in pre-build <br />#1 SpeedlayPre-Connect-To be determined in pre-build <br />#2 SpeedlayPre-Connect-To be determined in pre-build <br />Front BumperLine- To bedetermined in pre-build <br />LargeDiameterDischarge– To be determined in pre-build <br />Left Hose Bed Pre-Connect- To be determinedinpre-build <br />Right Hose Bed Pre-Connect- To be determinedin pre-build <br />LeftRearDischarge- To be determinedinpre-build <br />Right RearDischarge – Tobe determinedinpre-build <br />Deck Gun – Tobe determined inpre-build <br />Inlets– To bedetermined in pre-build <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.