My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
atthesidenearreartopofapparatus. <br />Theselights shallbe switched inthecabswitch panelas well asthepump panel. <br />YES/NO <br />Theselight(s)may beloadmanaged when the parkingbrake isset. <br />ELECTRICAL WIRING DIAGRAMS <br />Two (2)electricalwiringdiagrams,preparedforthe modelof chassisand body,shall be <br />YES/NO <br />provided.These drawing shall include AS BUILT diagrams. One print, one CD. <br />AMP DRAW REPORT <br />The biddershallprovide, at thetimeofbid and delivery, an itemizedprintoutofthe <br />expectedamp draw ofthe entirevehicle'selectrical system. <br />Themanufacturerof the apparatusshallprovidethefollowing: <br />1) Documentation oftheelectricalsystem performance tests. <br />2) A writtenloadanalysis,whichshallincludethefollowing: <br />A) The nameplaterating ofthealternator. <br />B) The alternatorrating undertheconditionsspecified per: <br />Applicable NFPA 1901 or1906 (Current Edition). <br />C) Theminimum continuous load of each componentthat is specified per: <br />Applicable NFPA 1901 or1906 (Current Edition). <br />D) Additionalloadsthat, when addedto theminimumcontinuousload,determinethe <br />totalconnected load. <br />E) Eachindividual intermittent load. <br />Allof the abovelisteditems shallbeprovided by thebidder per the applicable NFPA 1901 <br />or 1906(Current Edition). <br />YES/NO <br />WATER TANK <br />Boostertankshallhaveaminimum capacity of 500 gallonsand be constructedof <br />polypropylene plasticbyUnited PlasticFabricating,Incorporated. <br />The tank shall bestepped in designtoallowfora lowhosebed. <br />Tank jointsand seams shall be nitrogen welded insideand out. <br />Tank shall be baffled inaccordance with NFPA Bulletin 1901 requirements. <br />Bafflesshallhavevent openingsatboththe topandbottomto permit movementof air and <br />water betweencompartments. <br />Longitudinalpartitionsshall be constructed of .38"polypropylene plasticandshall extend <br />fromthe bottomofthetank throughthetop cover toallow for positive welding. <br />Transverse partitions shallextendfrom 4.00" offthebottomofthetanktothe undersideof <br />thetop cover. <br />All partitions shall interlock and shall be weldedto the tank bottom andsides. <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.