Laserfiche WebLink
South Bend Fire Department <br />One (1)Pike Pole, 6' Fbgls, I-Beam Hndl <br />90-16-2500 <br />PIKE POLE <br />One (1) 6' pike pole with I-Beam handle shall be provided. The pike pole shall be of fiberglass <br />construction. <br />One (1)Pike Pole, 8' Fbgls, I-Beam Hndl <br />90-16-2700 <br />PIKE POLE <br />One (1) 8' pike pole with I-Beam handle shall be provided. The pike pole shall be of fiberglass <br />construction. <br />One (1)Pike Pole,10' Fbgls, I-Beam Hndl <br />90-16-2900 <br />PIKE POLE <br />One (1) 10' pike pole with I-Beam handle shall be provided. The pike poleshall be of fiberglass <br />construction. <br />One (1)Miscellaneous LooseHardware, Bolts-Nuts-Washers-Screws <br />90-47-0100 <br />MISCELLANEOUSHARDWARE <br />Miscellaneous loose hardwareconsisting of bolts, nuts, washers, and screws shall be supplied <br />with the apparatusat time of delivery. <br />10040-001909/02/20 <br />92 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br />