Laserfiche WebLink
SPECIFICATIONS <br />CITYOF SOUTH BEND <br />SpecC – Two (2) MoreorLess Custom Rear Mount Pumpers <br />BID NAME <br />September8, 2020;9:30a.m. <br />FOR BIDS DUE <br />Pursuanttonoticesgiven,theundersignedoffersbid(s)totheCityofSouthBendinaccordance <br />withthefollowingattachment(s)whichspecifytheclassoritemnumberordescription,quantity, <br />unit, unit price. <br />SPEC C – TWO (2) MORE OR LESS CUSTOM REAR MOUNT PUMPERS <br />It is the intent of these specifications to describe avehicle or piece ofequipment for the City of <br />South Bend. The unit shall be bid as a fully equipped complete unit as setout in the attached <br />specifications. No partial or split bids will be accepted. Unit to be bid with and without trade-in <br />if applicable.Vendor tocomplete bid proposal contained in this bid specification and attach to <br />the submitted bid. <br />These are minimum specifications. Any variation from the specifications must be spelled out on <br />a separate deviation list in order for the bid to bevalid.Any items not listed on the deviation <br />sheet will be assumed to be part of the unit. <br />Proprietary products or specific manufacturers may be referencedherein.Such referencesare <br />only made to demonstrate minimum scope, quality, and style of the equipment desired. <br />Equipment that is bid pursuant to these specifications shall be of equal quality and size, or <br />greater, to those referenced, and are subject to approval by the South Bend Board of Public <br />Works. <br />Vendor shall provideall information requested in specifications to qualify for bid. If information <br />on brochure submitted does not completely cover specifications requested, it shall be typed and <br />attached to brochure. <br />If an alternate is included within these specifications, please beadvised that, alternate items <br />placed in the specifications are to determine the best configuration of the item within a budgeted <br />amount and may be included in the award criteria. If the Boardelects to award one or more (s), <br />the base bid price and the alternate bid price(s)will be totaled and compared for all bidders <br />offering thefinal configuration. Awardwill be made based on the lowest responsible/responsive <br />bid prices submitted for the base bid with selected (s), if applicable. Failure to submit a bid on <br />an alternate may result in the entire bid being non-responsive, depending on the final <br />configuration of the product. <br />Payment will be processed once the unit is inspected and accepted as to meeting the <br />specifications by the Division of Central Services. This will include all manuals and warranty <br />documentation. <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />