My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Fire Department <br />CommanderChassis <br />·Tie Rod Ends @ 0.02 CCM <br />·Brake S-Cams @ 0.01 CCM (Rockwell will not warrant application to caliper slide pins) <br />·Steering Assist Cylinder (If applicable) @ 0.02 CCM <br />·Drag Link @ 0.02 CCM <br />·Automatic Slack Adjusters @ 0.01 CCM <br />·Tilt Cab Lift Assembly (If applicable) @ 0.05 CCM <br />The lubrication system shall utilize the post lubrication principle and shallbe powered by an <br />electrically driven, 12V gear pump. The gear pump shall be top mounted to a reservoir assembly <br />with a capacity of 2.716 lbs grease liters. The electronic control unit shall be connected through <br />the ignition circuit, which shall provide power tothe pump when the engine is running. <br />The electronic control module shall include system monitoring capabilities for the main line and <br />operating cycle with a visual indicator for the vehicle operator, located in the overhead console. <br />The control module shall have LED'sand a system reset button to initiate a lube cycle for <br />diagnostic purposes and/or reset thecontrol module in the event a system fault has occurred. <br />Upon fault, the system shall be inoperable until the problem has beencorrected and the operator <br />or technician has initiated a system reset. <br />The gear pump and reservoir shall be located in an accessible location. <br />(Grease points may varydepending on specific options) <br />One (1)(4) Rear Tires12R22.5MichelinXDS"H" <br />07-07-0327 <br />REAR TIRES <br />The rear tires shall be Michelin 12R 22.5 16PR “H” tubeless radial XDS regional tread. <br />The rear tires shall feature: <br />·Astampedloadcapacityof27,120poundsperaxlewithaspeedcapacityof65milesperhour <br />when properly inflated to 120 pounds per square inch <br />Four (4) Counter Acting Balancing Beads <br />07-06-0436 <br />TIRE BALANCING <br />There shall becounteracting balancing beads used in all of the tires. <br />10039-001609/02/20 <br />50 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.